SOLUTION
Changzhou Kaide Environmental Technology
ZHG Solid preparation machine
ZHG Solid preparation machine unit
Advantage:
1. Traditional granulation, drying process is provided in each device individually purification, among a plurality of material in the rotation sequence to purify, can not avoid the man-made phenomenon of secondary pollution. The novel solid preparation granulating drying-line by way of custody transfer to ensure that the granulation and drying process is completed in the same room cleaned to eliminate the artificial secondary pollution, granulating, drying process more scientific and reasonable, reduced equipment footprint, making the production process more in line with GMP requirements.
2. The full account of the matching between the system devices, can be equipped with the appropriate type of equipment according to the user's actual yield and the dosage form so that optimum production process before and after the rational allocation of production to ensure continuity and stability.
3. Man-machine interface control system, for wet granulation boiling dry granulation process data were stored, collected and printed. Through a control cabinet control more than one device parameter setting and monitoring, all parameters can be set and modified by grade level has a corresponding multi-level password. The main menu on the control system can reflect the real-time work status, statistics, through the self-diagnostic system reflect fault conditions and alarm recording equipment so that production process is fully automated, and ensure the stability of the process.
4. Make the wet granulation and fluidized drying granulator machine respective advantages of the device to be fully reflected. While using a wet granulator and dry granulator integrated with the system to ensure high granulation yield.
5. The vacuum feeding device, transfer order lifting device has a high automation production conditions, the use of automated, mechanized production line to replace the traditional manual operations, reduce labor intensity and dust pollution.
6. According to user needs, in a multi-point setting in place automatic cleaning nozzle, the CIP CIP has been a reliable guarantee.
Technical Parameters:
Specification | ZHG-30 | ZHG-60 | ZHG-120 | ZHG-150 | ZHG-250 | ZHG-300 |
Yield | 30 | 60 | 120 | 150 | 250 | 300 |
model | LD100 | LD200 | LD300 | LD400 | LD600 | LD800 |
ZKS-1 | ZKS-1 | ZKS-2 | ZKS-3 | ZKS-3 | ZKS-4 | |
GHL-100 | GHL-200 | GHL400 | GHL500 | GHL800 | GHL-1000 | |
GZL-80 | GZL-180 | GZL-250 | GZL-300 | GZL-350 | GZL-350 |
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.