PRODUCTS
Changzhou Kaide Environmental Technology
PRODUCTS
ORDER
Changzhou Kaide Environmental Technology
+86-519-89888985
Radiator
Overview:
SRL heat sink 37 kinds of specifications, the radiator is used in the steel tube bundle composed of aluminum fins, it is in close contact with the aluminum and steel, thermal performance, use and reliable.
SRL type radiator with steam or hot water as heat medium, steam pressure up to 8Kg / cm2 :, hot water temperature of 160 deg.] C, the air conditioning system suitable for air heating and drying chamber.
SRL radiator divided into two rows of tubes and pipes are arranged in three rows along the flow direction, the models for example as follows:
SRL-5 times; 5/2 & mdash; & mdash; two rows along the direction of airflow tube staggered.
SRL-5 times; 5/3 & mdash; & mdash; along the flow direction three rows of staggered tube.
SRL radiator heat transfer coefficient of resistance in the following table:
Radiator Model | Medium heat | Heat transfer coefficient K Kcal/m2℃ |
Mm of water resistance |
SRLB×A/2 | Steam (a gauge pressure) | K=13.1(Vγ)0.40 | H=0.174(Vγ)1.67 |
Superheated water130℃ (0.023-0.037) |
K=14.2(Vγ)0.24 | H=0.153(Vγ)1.58 | |
SRLB×A/3 | Steam (a gauge pressure) | K=13.0(Vγ)0.43 | H=0.309(Vγ)1.62 |
Superheated water130℃ (0.0154-0.038) |
K=12.5(Vγ)0.29 | H=0.296(Vγ)1.58 |
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.