PRODUCTS
Changzhou Kaide Environmental Technology
PRODUCTS
ORDER
Changzhou Kaide Environmental Technology
+86-519-89888985
Fluidized Granulator
Principle
Material powder particles in the material container (fluidized bed) was boiling in a fluidized state by the heated air is preheated and mixed after purification, the binder solution sprayed into the spray, so some particles to contain a binder pellets, since the hot air drying of materials continue to make pellets in the water evaporates, the adhesive sets, this process is repeated continuously, form an ideal, uniform microporous spherical particles.
Feature
※By powder granulation, improve liquidity, reduce dust;
※By powder granulation to improve its solubility;
※Mixing, granulating, drying can be completed in one step granulation machine;
※Made of antistatic filter cloth, equipment operation safety;
※Setting the pressure relief hole event of an explosion, equipment personnel from harm;
※Equipment no dead ends, lighter, faster loading and unloading, rinse, to meet the GMP standard.
application
※Granulated pharmaceutical industry: tablet granule, granules, capsules, granules.
※Granulated food industry: cocoa, coffee, milk powder, granule juice, spices and the like.
※Oher industries granulation: pesticides, feed, fertilizer, pigment, dyestuff and so on.
※Powdered or granular drying wet materials.
※Coating: granule, pill protection layer, color preparation, sustained-release, film, and other enteric coating.
Technical Specifications
project | unit | Type | |||||||||
3 | 5 | 15 | 30 | 60 | 120 | 200 | 300 | 500 | |||
Material container | capacity | L | 12 | 22 | 45 | 100 | 220 | 420 | 670 | 1000 | 1500 |
diameter | ㎜ | 300 | 400 | 550 | 700 | 1000 | 1200 | 1400 | 1600 | 1800 | |
Production capacity | Least | ㎏ | 1.5 | 4 | 10 | 15 | 30 | 80 | 100 | 150 | 250 |
maximum | ㎏ | 4.5 | 6 | 20 | 45 | 90 | 160 | 300 | 450 | 750 | |
Fan | Wind | m3/h | 1000 | 1200 | 1400 | 1800 | 3000 | 4500 | 6000 | 7000 | 8000 |
Wind pressure | ㎜H2O | 375 | 375 | 480 | 480 | 950 | 950 | 950 | 950 | 950 | |
power | kw | 3 | 4 | 5.5 | 7.5 | 11 | 18.5 | 22 | 30 | 45 | |
Steam consumption | kg/h | 15 | 23 | 42 | 70 | 141 | 211 | 282 | 366 | 451 | |
Compressed air Consumption |
m3/min | 0.9 | 0.9 | 0.9 | 0.9 | 1.0 | 1.0 | 1.1 | 1.5 | 1.5 |
Weight | kg | 500 | 700 | 900 | 1000 | 1100 | 1300 | 1500 | 1800 | 2000 | |||
steam pressure | Mpa | 0.3~0.6 | |||||||||||
temperature | ℃ | Water temperature can be adjusted within the range of -120 ℃ | |||||||||||
Working time | min | With dependent material properties45~90 | |||||||||||
Material yield | % | ≥99 | |||||||||||
noise | dB(A) | Fan and host isolation installation, noise≤75dB(A) | |||||||||||
Master shape size (L×W×H) |
m | 1.0×0.6 ×2.1 |
1.2×0.7 ×2.1 |
1.25×0.9 ×2.5 |
1.6×1.1 ×2.5 |
1.85×1.4 ×3 |
2.2×1.65 ×3.3 |
2.34×1.7 ×3.8 |
2.8×2.0 ×4.0 |
3×2.25 ×4.4 |
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.