PRODUCTS
Changzhou Kaide Environmental Technology
PRODUCTS
ORDER
Changzhou Kaide Environmental Technology
+86-519-89888985
Vacuum Harrow Dryer
Principle
Rake vacuum dryer is a new horizontal batch vacuum drying equipment, wet material by evaporation conduction with blade stirrer continuously remove heat material surface, and the passage formed in the container recycle stream after water evaporation sucked away by the vacuum pump.
Features.
The machine uses a large mezzanine area heating, heat transfer surface large, high thermal efficiency.
The machine is set stirring, the material in the barrel to form a continuous cycle of state, to further improve the uniformity of the material heated.
The machine is set stirring, allowing smooth certificate, paste, paste material drying.
Applications
※Apply paste, paste and powder materials.
※It requires low-temperature drying of heat sensitive materials.
※Easily oxidized, explosive, strong stimulation, highly toxic materials.
※Recover solvent materials.
Technical Specifications
Items | Model | |||||||
Name | unit | ZPG-500 | ZPG-750 | ZPG-1000 | ZPG-1500 | ZPG-2000 | ZPG-3000 | ZPG-5000 |
Working volume | L | 300 | 450 | 600 | 900 | 1200 | 1800 | 3000 |
The inner cylinder size | ㎜ | φ600×1500 | φ800×1500 | φ 800×2000 | φ1000×2000 | φ1000×2600 | φ1200×2600 | φ1400×3400 |
Stirring speed | rpm | 5-25 | 5-12 | 5 | ||||
power | kw | 4 | 5.5 | 5.5 | 7.5 | 11 | 15 | 22 |
Jacket design pressure | Mpa | ≤0.3 | ||||||
Cylinder pressure | Mpa | -0.09~-0.096 |
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.