常州凯德环保科技

Changzhou Kaide Environmental Technology

PRODUCTS

Changzhou Kaide Environmental Technology

PRODUCTS

ORDER

Changzhou Kaide Environmental Technology

+86-519-89888985

Pharmaceutical GMP drying oven

Outline

Steam heating, electricity, oil, electric heating steam dual four ways.

Temperature: steam heating 50-140 ℃, maximum 150 ℃;

Electrically heated 50 & mdash; 350 ℃;

HTF 150 ~ 250 ℃

Implementation of automatic temperature control, and has recorder record;

Inside walls are fully welded, are used at each transition arc transition, no dead ends.

Sealing machine, a unique rail seal, ensure the machine seal.

Inlet is equipped with high efficiency air filter; Moisture port supporting the efficiency air filter.

Double-door two-door oven achieve mechanical interlock;

Oven the parts can be assembled and disassembled quickly installed to facilitate cleaning;

The control system has text display and touch screen for your choice;

The whole in line with & ldquo; GMP & rdquo; requirements. & Nbsp;

 

Technical Specifications

Technical Parameters
Model Specifications
Each time the amount of drying
(Kg)
Fan power
(KW)
Steam consumption
(Kg/h)
Drying cars
(Vehicles)
Baking tray
(only)
W×D×H(mm) Upper and lower temperature
(℃)
GMP-0 35 0.45 8 / 16 1130×1100×1750 ±2
GMP-I 120 0.45 18 2 48 2300×1200×2000 ±2
GMP-II 240 0.9 36 4 96 2300×2200×2000 ±2
GMP-III 360 1.35 54 6 144 2430×2200×2000 ±2
GMP-IV 480 1.8 72 8 192 4460×2200×2290 ±2

常州凯德环保科技

Changzhou Kaide Environmental Technology

Integrity

win-win

■   Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City

■   P.C.: 213000

■   Contact: Manager Xu +86-13606111591

■   Tel: +86-519-89888985

■   Fax: +86-519-88678990

■   E-mail: sales@kaidedry.cn

HOME  |   SOLUTION  |   PRODUCTS  |   NEWS  |   ABOUT US  |   CONTACT  |   中文版

Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2

FAQ

①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.

②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.

③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.

④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.