PRODUCTS
Changzhou Kaide Environmental Technology
PRODUCTS
ORDER
Changzhou Kaide Environmental Technology
+86-519-89888985
Conical Vacuum Dryer
Working principle
SZGDouble-cone rotating vacuum Dryer double cone rotating tank, the tank in the vacuum state, to the jacket into a thermal oil or hot water heating, heat through the tank wall contact with the wet material contact. Evaporation of water vapor or other gases after wet material absorbs heat through the vacuum pump through the vacuum exhaust pipe is pumped. Since the tank body in a vacuum state, and the rotating of tank so that the material constant up and down, inside and outside the flip, it accelerated the drying rate of materials, improve drying rate, to achieve uniform drying purposes.
Feature
Double-cone rotating vacuum Dryer is a hybrid - drying in one of the new Dryer. The condenser, vacuum pump and supporting Dryer, vacuum drying device components. (Such as do not need solvent recovery condenser or may not) advanced design of this machine, the internal structure of simple, easy to clean, discharge all raw material, easy to operate.Can reduce labor intensity and improve the working environment. At the same time the rotation of container materials also rotated, but the wall does not plot material, so heat transfer coefficient, drying rate, not only save energy, but full uniform drying, good quality. It can be widely used in pharmaceutical, chemical, food, dye and other industries drying.
Applications
This machine is suitable for pharmaceutical, food, chemical and other industries powder, vacuum drying and mixing of granular materials, especially suitable for drying by the following
※We can not accept the high temperature heat-sensitive materials to be recovered material
※solvents and toxic gases
※easily oxidized, hazardous materials
※required for crystalline materials
※requires a very low residual volatile matter content material
Technical Specifications
Name Type |
100 | 350 | 500 | 750 | 1000 | 1500 | 2000 | 3500 | 4500 | 5000 | |||
Tank volume (L) | 100 | 350 | 500 | 750 | 1000 | 15000 | 2000 | 3500 | 4500 | 5000 | |||
The maximum loading volume(L) | 40 | 140 | 200 | 300 | 400 | 600 | 800 | 1400 | 1800 | 2000 | |||
The maximum loading weight(kg) | 20 | 70 | 100 | 150 | 200 | 300 | 400 | 700 | 900 | 1000 | |||
Speed (rpm) | 3~13 | 6 | 5 | 4 | 4 | 4 | |||||||
Motor Powerk w) | 0.75 | 1.1 | 1.5 | 2.2 | 3 | 4 | 5.5 | 7.5 | 11 | 15 | |||
Area (mm) | 2160 ×800 |
2160 ×800 |
2350 ×800 |
2560 ×1000 |
2860× 1300 |
3060 ×1300 |
3260 ×1400 |
3760 ×1800 |
3960 ×200 |
4400 ×2500 |
|||
Rotating height(mm) | 1750 | 2100 | 2250 | 2490 | 2800 | 2940 | 2990 | 3490 | 4100 | 4200 | |||
Tank design pressure (MPa) | -0.1~0.15 | ||||||||||||
Jacket design pressure(MPa) | ≤0.3 | ||||||||||||
Weight(kg) | 800 | 1100 | 1200 | 1500 | 2800 | 3300 | 3600 | 6400 | 7500 | 8600 | |||
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.