PRODUCTS
Changzhou Kaide Environmental Technology
PRODUCTS
ORDER
Changzhou Kaide Environmental Technology
+86-519-89888985
Hot air circulation drying oven
Applications
Hot air circulation oven heating is suitable for pharmaceutical, chemical, food, agricultural and sideline products, aquatic products, light industry, heavy industry materials and products for curing, drying dehydration. As raw material medicine, Chinese medicine, Chinese Herbal Medicine, extracts, powders, granules, powder, water pills, bottles, pigments, dyes, dehydrated vegetables, dried fruit, sausages, plastic resin, electric elements, drying varnish and so on.
Feature
※Most of hot air inside the loop, high thermal efficiency, energy conservation.
※Utilizing the principle of forced ventilation box with adjustable air divider plate, uniform drying. Source may be steam, hot water, electricity, far infrared wide, wide choice.
※Machine has low noise, smooth operation. Temperature controlled, easy installation and maintenance.
※Wide range of applications, can be used for drying various materials and is a versatile drying equipment.
Technical Specifications
No. | model | YY0026 -90 Industry Standard model |
Technical Parameters | Fitting | total weight (kg) |
||||||||||
evaporation area (㎡) |
Effective volume (㎡) |
Dry each time amount (kg / batch) |
Radiator area (㎡) |
Steam consumption (kg/h) |
Electric heating power (kw) |
Fan Wind (㎡/h) |
Fan Electric power (kw) |
Shape size W×D×H |
A3 is equipped with drying cars (vehicles) |
Should be equipped with a baking tray (only) |
Temperature Automatic Control Box |
||||
1 | CT-C-O | RXH-7-C | 7.1 | 1.3 | 60 | 15 | 15 | 6-9 | 4510 | 0.45 | 1380×1200×2000 | 1 | 24 | Have | 820 |
2 | CT-C-Ⅰ | RXH-14-C | 14.1 | 2.6 | 120 | 23 | 20 | 15 | 4510 | 0.45 | 2260×1200×2000 | 2 | 48 | Have | 1580 |
3 | CT-C-Ⅱ | RXH-27-C | 28.3 | 4.9 | 240 | 48 | 40 | 30 | 9020 | 0.45×2 | 2260×2200×2000 | 4 | 96 | Have | 1800 |
4 | CT-C-ⅡA | RXH-27-C | 28.3 | 4.9 | 240 | 48 | 40 | 30 | 9020 | 0.45×2 | 4280×1200×2270 | 4 | 96 | Have | 1880 |
5 | CT-C-Ⅲ | RXH-41-C | 42.4 | 7.4 | 360 | 72 | 60 | 45 | 13530 | 0.45×3 | 2260×3200×2000 | 6 | 144 | Have | 2100 |
6 | CT-C-ⅢA | RXH-41-C | 42.4 | 7.4 | 360 | 72 | 60 | 45 | 13530 | 0.45×3 | 3240×2200×2000 | 6 | 144 | Have | 2210 |
7 | CT-C-Ⅳ | RXH-54-C | 56.5 | 10.3 | 480 | 96 | 80 | 60 | 18040 | 0.45×4 | 4280×2200×2270 | 8 | 192 | Have | 2800 |
8 | CT-Ⅰ | RXH-14-B | 14.1 | 2.6 | 120 | 23 | 20 | 15 | 1414 | 1.1 | 2480×1200×2375 | 2 | 48 | No | 1220 |
9 | CT-Ⅱ | RXH-27-B | 28.3 | 4.9 | 240 | 48 | 40 | 30 | 5230 | 1.1 | 2480×2200×2438 | 4 | 96 | No | 1530 |
10 | CT-Ⅲ | RXH-41-B | 42.4 | 7.4 | 360 | 72 | 60 | 45 | 9800 | 2.2 | 3430×2200×2620 | 6 | 144 | No | 2110 |
11 | CT-Ⅳ | RXH-54-B | 56.5 | 10.3 | 480 | 96 | 80 | 60 | 9800 | 2.2 | 4460×2200×2620 | 8 | 192 | No | 2300 |
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ Address: Zhongjiang Development Zone, Zhenglu Town, Changzhou City
■ P.C.: 213000
■ Contact: Manager Xu +86-13606111591
■ Tel: +86-519-89888985
■ Fax: +86-519-88678990
■ E-mail: sales@kaidedry.cn
HOME | SOLUTION | PRODUCTS | NEWS | ABOUT US | CONTACT | 中文版
Copyright(C)2022, Changzhou Kaide Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备16034749号-2
①Q: Are you trading company or manufacturer ?What about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
②Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
③Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
④Q: What is your terms of payment ?
A: Payment: 30% advance payment, arrange equipment production, pay the balance payment, your shipment.