新闻中心
Changzhou Kaide Environmental Technology
Vibrating Fluidizing Dryer Installation completed in Republic of Senegal
发布时间:2024-03-25
Warmly celebrate the completion of the installation and commissioning of our vibrating fluidized bed in Senegal. Customers give high satisfaction and praise.
In October 2023, the Senegal customer came to visit our company and launched a technical discussion on the equipment. Technical issues were studied and discussed during the day. The contract was signed the next day. Our company began to produce vibrating fluidized bed dryer according to customer requirements. After two months of design and production, the equipment was completed with high requirements and high standards, and the equipment was installed and tested.
At the beginning of 2024, the equipment was successfully declared for export. After a month of sea transportation, it will arrive at the customer's factory in February 2024. Our company immediately dispatched installation engineers to Senegal factory. Although it is already the Chinese Spring Festival holiday. But for the customer's production and input. The engineer gave up his holiday and went to the customer's factory for installation and commissioning.
Since the early work is completed in China, the installation and debugging are relatively smooth. But there were a lot of surprises. Engineers with many years of experience and solid theoretical foundation. The operation and production of the equipment were completed within 15 days.
The customer is very satisfied with the design and manufacture of the equipment. And to our company sent a satisfactory questionnaire return visit. Give the installation and debugging personnel full marks evaluation.
Thank customers for their trust and support, and hope to provide more customers with perfect production line design and perfect after-sales service.
常州凯德环保科技
Changzhou Kaide Environmental Technology
Integrity
win-win
■ 地 址:常州市郑陆镇中绛开发区
■ 邮 编:213000
■ 联系人:徐经理 13606111591
■ 电 话:0519-89888985
■ 传 真:0519-88678990
■ 邮 箱:sales@kaidedry.cn
首页 | 成套解决方案 | 产品中心 | 新闻中心 | 关于我们 | 联系我们 | ENGLISH
常州凯德环保科技有限公司 版权所有(C)2022 网络支持 化工网 生意宝 生意社 著作权声明 备案序号:苏ICP备16034749号-2
①问:你们是贸易公司还是生产厂家。有什么售后服务?
答:我们是生产工厂。我们在商务贸易前后都会提供相关的服务。首先,我们为您提供实验室或样本。然后在出厂之前,可以在我们公司检查设备机械,空转运营,并教导操作说明。后期我们的工程师也会现场指导安装。一旦设备损坏,我们的维修人员会在48小时内到达。任何配件坏了,我们将在12小时内反馈。
②问:你们的交货时间要多久?
答:如有有现货,一般交货期为10 - 20天。如果现场制作,或者根据要求生产,交货期为30 - 45天。
③问:什么是最小订量?
答:对于我们的机器,你可以基于你的购买计划。只是一套也是受欢迎的。
④问:你的付款条件是怎样的?
答:付款方式:30%预付款,安排设备生产,付清尾款,款到发货。